Gulf Coast Grain, Inc. | Utica, Illinois
1 | Grain Shipping Terminal
Expansion in the grain market and the need for a quicker route to a starving export market necessitated the expansion of GCC's operation. This facility, built on the Illinois River, included sheet pile mooring cells, structural steel erection and material conveying from a hopper truck dump.